Aditya L1, India's first-ever solar mission, will be launched by the ISRO on Friday from Andhra Pradesh's Sriharikota.
The journey to the designated mission site is a staggering 1.5 million km from the Earth and will take about four months to cover, ISRO said.
“Subsequently, the orbit will be made more elliptical and later the spacecraft will be launched towards the Lagrange point L1 by using on-board propulsion," it said. While travelling towards L1, Aditya L1 will exit the earth’s gravitational Sphere of Influence. Once out of it, its "cruise phase" will begin and the craft will be injected into a large halo orbit around L1. “ The total travel time from launch to L1 would take about four months for Aditya-L1,” the ISRO said.
There are five Lagrange points in a system like the Earth-Sun system – L1 to L5. The L1 and L2 points, closest to the planet, serve as good spots for observational studies.
Disclaimer: This Article is auto-generated from the HT news service.